×
App Icon
The Standard e-Paper
Kenya's Bold Newspaper
★★★★ - on Play Store
Download Now

Hydro power output low despite downpour

Vocalize Pre-Player Loader

Audio By Vocalize

Masinga Dam, the main reservoir for Seven Forks cascade, yet to get full. [Muriithi Mugo, Standard]

The cost of power in the country is not likely to go down soon as water levels at the Seven Forks hydro stations are still low despite heavy rainfall experienced in parts of the country.

KenGen engineers are estimating to get maximum levels of water at Masinga Dam, the main reservoir for the Seven Forks hydro station, in the next four months if the current rains continue.

Get Full Access for Ksh299/Week.
Bold Reporting Takes Time, Courage and Investment. Stand With Us.
  • Unlimited access to all premium content
  • Uninterrupted ad-free browsing experience
  • Mobile-optimized reading experience
  • Weekly Newsletters
  • MPesa, Airtel Money and Cards accepted
Already a subscriber? Log in
Opinion
Tapping indigenous engineering knowledge and architecture
Real Estate
Educational institutions boost investors' appetite in Murang'a
Real Estate
How towers are competing for Nairobi's skyline
Real Estate
Why Sacco members are shunning guarantors for property as collateral