×
App Icon
The Standard e-Paper
Kenya's Bold Newspaper
★★★★ - on Play Store
Download Now

Hydro power output low despite downpour

Masinga Dam, the main reservoir for Seven Forks cascade, yet to get full. [Muriithi Mugo, Standard]

The cost of power in the country is not likely to go down soon as water levels at the Seven Forks hydro stations are still low despite heavy rainfall experienced in parts of the country.

KenGen engineers are estimating to get maximum levels of water at Masinga Dam, the main reservoir for the Seven Forks hydro station, in the next four months if the current rains continue.

Get Full Access for Ksh299/Week
Unlock the Full Story — Join Thousands of Informed Kenyans Today
  • Unlimited access to all premium content
  • Uninterrupted ad-free browsing experience
  • Mobile-optimized reading experience
  • Weekly Newsletters
  • MPesa, Airtel Money and Cards accepted
Already a subscriber? Log in
Business
Top banks ready Sh298.1b war chest for looming loan defaults
Business
KQ partners with Blueberry Travel in emissions offset initiative, plants 308 trees
Sci & Tech
Humanoid robot arrives at Kenyan university as Africa joins global AI training race
Sci & Tech
Standard journalist wins continental biotechnology reporting award